ODN/EPS Main Trunks

Created by Captain Natira Dareese on Tue Sep 22nd, 2026 @ 9:25pm

These compartments carry the ship's primary optical data network (ODN) and electro-plasma system (EPS) trunk lines at the major structural transition points where they run in bulk between hull sections. Each is a long, narrow space dominated by the two systems running in parallel - a dense bundle of amber-glowing optical data conduit on one side and a heavier, more insulated set of armored EPS power conduits on the other - with inspection panels, junction nodes, or a technical console along the way for monitoring flow, load, and fault status. The EPS side always runs warmer to stand near, radiating heat through its insulation, while the ODN side stays cooler and carries a faint, almost musical high-frequency hum from data traffic; together the two form a layered, unbroken background hum characteristic of these spaces. Walls are bare structural framework rather than finished paneling, and lighting is bright and utilitarian, angled to keep conduit labels and status indicators legible. Notable Variants Saucer Trunks (Deck 8): The last major access space in the saucer section before its systems narrow and funnel down into the neck connecting to the engineering hull. Two parallel trunk runs, each about as wide as a person's torso, run the length of the compartment at chest height on heavy structural brackets before diving together through a reinforced deck aperture toward the neck junction below. A single technical console near the entrance can isolate either trunk for maintenance, showing flow and load data in split-screen LCARS panels. The compartment carries a persistent structural creak common to spaces this close to a major hull transition point. Engineering Trunks (Deck 15): The counterpart facility at the engineering hull's junction point, running almost the full width of the hull. Towering racks of trunk conduit rise from deck to overhead in tightly packed vertical bundles on both long sides, the optical lines visible through small inspection windows and the EPS conduits banded in reflective silver. A central maintenance aisle wide enough for two people runs between the facing conduit walls, its non-slip composite decking worn pale down the middle, with rounded junction node housings bulging outward at intervals, each showing a status light (green, amber during a load rebalance, red when a fault is isolated and rerouted). A rolling diagnostic cart with isolinear test equipment is typically parked near the midpoint, and the air carries a mix of ozone and a hot-dust smell characteristic of high-throughput power distribution.

Categories: Ship Locations